Our Projects

Sl No. Project Description Name of Client / Organization Value in (Crores)
1
ERM & P.C.C. lining of L.M.C. & R.M.C. and Renovation of its distributaries for Sundar Reservior Scheme
Executive Engineer, Irrigation Division, Godda, Camp-Mahagama
99.71
2
Earthwork in cutting and filling, blanketing and construction of minor bridges, R.O.B and R.U.B / L.H.S in between Km. 21.250 to Km. 32.450 in connection with construction of new BG line between Hansdiha to Godda.
Dy. Chief Engineer, Eastern Railway, Bhagalpur
65.94
3
ERM of Triveni Weir scheme including linning of Main Canal From Ch. 0.00 to Ch. 1008.00 and renovation of Kachuatikar and Naukhil Dity
Executive Engineer, Irrigation Division, Godda, Camp - Mahagama
60.37
4
Construction of residual work of Kamla Syphon, Guide Bundh and Canal connection at R.D. 139.10 of Western Kosi Canal.
Executive Engineer, Western Kosi Canal Division No. 1, Jaynagar (Madhubani)
52.61
5
Anti Erosion work on the right bank of river Ganga from Rafa Tola to Srighar -10 no, Rajmahal(Sahibganj)
Executive Engineer, Ganga Pump Canal Division, Sahibganj.
55.96
6
Construction of Earth work & lining work of Main canal From R.D. 47.10 to 142.80 under Bateshwarsthan Ganga Canal Scheme in Godda District.
Executive Engineer, Irrigation Division, Godda, Camp-Mahagama.
47.61
7
Restoration and lining work of Mayurakshi left Bank canal.
Executive Engineer, Irrigation Division, Dumka
47.11
8
Construction of substructure of ROB no. 91,99,111,113,123,127 & 149 between Pirpainti - Bhagalpur & RCC bridges between Kahalgaon- Lailakhmamlakha.
Dy. Chief Engineer(Con) Eastern Railway, Jamalpur
47.33
9
Restoration of flexible apron of R.G.B , L.G.B & Divide wall of Kosi Barrage.
Executive Engineer, Head works Division, Birpur
34.9
10
Residual Earth Work of punasi Main Canal From Ch. 486 to Ch 1370.
Executive Engineer, Irrigation Division, Deoghar.
34.04
11
Construction of ROB in lieu of level X-ing Gate No. 7-AT in between Chittranjan-Bodma on main line
Dy. Chief Engineer(Con) Eastern Railway, Asansol
27.1
12
Construction of ROB in lieu of level X-ing Gate No. 9-BT in between Jamtara-Bodma on main line section.
Dy. Chief Engineer(Con) Eastern Railway, Asansol
22.27
13
Widening & Strengthening/Reconstruction of Murchura More(on NH 114A)- Chathara- Bagdabra-Kolhadiya-Sonraidhi (on MDR-224) Road (Total Length- 13.966 KM) including Bridge Construction.
Executive Engineer, RCD, Road Division, Deoghar
24.99
14
Construction of Ajoy Barrage from 0 to 15 Bay and its head regulator, Bearing.
Executive Engineer, Irrigation Division, Sikatia, Doghar
24.88
15
Earthwork in filling & Cutting, Blanketing and construction of Minor Bridges in between Katoria yard (30.500KM) to Kharjhousa Station (38.900KM) in Connection with New B.G. Rail Line Between Deoghar-Sultanganj.
Dy. Chief Engineer/con, Eastern Railway, Bhagalpur,
24.05
16
Rasing, Strengthening, Construction of Bituminous Road,from Kunauli to Dagmara.
Executive Engineer, Western Embankment Division,
20.43